Bernard Hunter LTM110042 Review of 100ton Allterrain Crane
November 27, 2025
When towering structures rise from the ground or when massive equipment requires precise positioning, cranes – these steel behemoths – become indispensable forces in modern construction projects. Among these mechanical giants, Bernard Hunter's LTM1100-4.2 all-terrain crane stands out with its exceptional performance and operational versatility.
The LTM1100-4.2 is a 100-ton capacity all-terrain crane that delivers maximum lifting performance at a 3-meter working radius. This capability allows it to handle diverse heavy-load lifting requirements across various working conditions.
Equipped with a 60-meter telescopic boom and detachable folding jib, this crane achieves a maximum lifting height of 91 meters and a working radius of 58 meters. Such specifications make it particularly suitable for complex operations in high-rise construction and large bridge projects. The telescopic boom design enables efficient operation even in confined spaces, significantly improving construction productivity.
Beyond its impressive lifting capacity, the LTM1100-4.2 boasts remarkable mobility. Its four-axle chassis provides excellent off-road capability and driving stability, allowing it to navigate challenging terrains. This design facilitates rapid relocation between job sites, reducing transportation costs and downtime.
- Load moment limiter
- Anti-tipping protection system
- Hoist limit device
These safety mechanisms continuously monitor operational parameters and trigger immediate alerts when detecting abnormal conditions, effectively preventing potential accidents.
Bernard Hunter's LTM1100-4.2 represents a high-performance, reliable lifting solution for modern construction needs. Its combination of robust lifting capacity, exceptional mobility, and comprehensive safety features makes it an ideal choice for heavy-duty operations. While the crane demonstrates impressive capabilities, potential users should carefully evaluate its suitability based on specific project requirements and working environments to maximize its performance advantages.

