1.2 Km/H 220T Crawler Crane Xcmg In Heavy Machinery Handling And Improve Production Efficiency
Product Details:
Place of Origin: | China |
Brand Name: | XCMG |
Model Number: | XLC220 |
Payment & Shipping Terms:
Minimum Order Quantity: | One Crane |
---|---|
Price: | Negotiable Price |
Packaging Details: | Packing According to Customer Requirements |
Delivery Time: | According to Order Confirmation |
Payment Terms: | L/C,T/T |
Supply Ability: | Supply According to Customer Needs |
Detail Information |
|||
Jib Angle: | 15,30° | Operation Weight: | 48.6 T |
---|---|---|---|
Jib Length: | 60 Meters | Maximum Gradeability: | 30% |
Weight: | 24.6 T | Max Lifting Height: | 93/106.5m |
Max Boom Length: | 13m-52m | Fly Jib Length: | 13-25 M |
Engine Rated Power: | 242 /2100 Kw/rpm | Gradeability: | 30% |
Max Travel Speed: | 1.2 Km/h | Condition: | Used, In Good Working Condition |
Highlight: | 220t crawler crane xcmg,220t xcmg crawler crane,1.2 km/h crawler crane xcmg |
Product Description
220T Crawler Crane Can Play A Key Role In Heavy Machinery Handling And Improve Production Efficiency
XLC220 Crawler Crane Technical Specifications
Crawler crane models: XLC220
Max rated lifting capacity: 220t
Max lifting moment: 1239t.m
Typical working conditions
Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook
Operating radius(m)
|
Main boom length(m) |
|||||||||||
17 |
20 |
23 |
26 |
29 |
32 |
35 |
38 |
41 |
44 |
47 |
50 |
|
5 |
220.0 |
|
|
|
|
|
|
|
|
|
|
|
6 |
196.0 |
192.0 |
190.5 |
179.0 |
|
|
|
|
|
|
|
|
7 |
177.0 |
176.0 |
174.5 |
173.5 |
167.0 |
156.0 |
144.0 |
|
|
|
|
|
8 |
154.5 |
154.0 |
153.5 |
151.9 |
147.3 |
144.7 |
138.2 |
127.0 |
115.0 |
103.0 |
|
|
9 |
136.0 |
136.0 |
135.2 |
133.4 |
131.0 |
127.0 |
124.0 |
121.0 |
109.0 |
103.0 |
101.0 |
|
10 |
115.0 |
115.0 |
116.0 |
116.0 |
115.0 |
112.0 |
110.0 |
107.0 |
105.0 |
102.0 |
99.0 |
91.0 |
12 |
87.5 |
87.9 |
88.2 |
88.3 |
88.4 |
88.4 |
88.4 |
87.2 |
85.5 |
83.8 |
82.2 |
80.6 |
14 |
69.7 |
70.2 |
70.5 |
70.6 |
70.7 |
70.7 |
70.6 |
70.6 |
70.5 |
70.3 |
69.1 |
67.8 |
16 |
57.4 |
58.0 |
58.3 |
58.4 |
58.5 |
58.5 |
58.4 |
58.3 |
58.3 |
58.1 |
58.0 |
57.9 |
18 |
|
49.0 |
49.3 |
49.5 |
49.6 |
49.5 |
49.5 |
49.4 |
49.3 |
49.2 |
49.1 |
48.9 |
20 |
|
|
42.5 |
42.6 |
42.7 |
42.7 |
42.7 |
42.6 |
42.5 |
42.4 |
42.2 |
42.1 |
22 |
|
|
|
37.2 |
37.4 |
37.3 |
37.3 |
37.2 |
37.1 |
37.0 |
36.9 |
36.7 |
24 |
|
|
|
32.8 |
33.0 |
33.0 |
33.0 |
32.9 |
32.8 |
32.6 |
32.5 |
32.3 |
26 |
|
|
|
|
29.3 |
29.4 |
29.4 |
29.3 |
29.2 |
29.1 |
28.9 |
28.7 |
28 |
|
|
|
|
|
26.3 |
26.3 |
26.2 |
26.2 |
26.0 |
25.9 |
25.7 |
30 |
|
|
|
|
|
|
23.7 |
23.7 |
23.6 |
23.5 |
23.3 |
23.1 |
32 |
|
|
|
|
|
|
21.5 |
21.4 |
21.4 |
21.2 |
21.1 |
20.9 |
34 |
|
|
|
|
|
|
|
19.5 |
19.4 |
19.3 |
19.2 |
19.0 |
36 |
|
|
|
|
|
|
|
|
17.7 |
17.6 |
17.4 |
17.3 |
38 |
|
|
|
|
|
|
|
|
|
16.0 |
15.9 |
15.8 |
40 |
|
|
|
|
|
|
|
|
|
14.7 |
14.6 |
14.4 |
42 |
|
|
|
|
|
|
|
|
|
|
13.3 |
13.2 |
44 |
|
|
|
|
|
|
|
|
|
|
|
12.1 |
Magnification |
18 |
18 |
16 |
14 |
13 |
12 |
11 |
10 |
9 |
9 |
8 |
8 |
Notes:
1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.
Main boom working condition_HBS/1_75t+21t main boom main hook performance with arm end pulley auxiliary hook
Operating radius(m) |
Main boom length(m) |
||||||||||
53 |
56 |
59 |
62 |
65 |
68 |
71* |
74* |
77* |
80* |
83* |
|
10 |
85.4 |
81.5 |
78.5 |
68.5 |
|
|
|
|
|
|
|
12 |
79.4 |
77.9 |
76.4 |
66.5 |
65.5 |
62.6 |
60.2 |
55.0 |
|
|
|
14 |
67.0 |
65.8 |
64.6 |
63.5 |
62.3 |
60.5 |
58.5 |
53.5 |
48.8 |
44.6 |
40.8 |
16 |
57.6 |
56.6 |
55.7 |
54.7 |
53.8 |
53.0 |
52.0 |
51.3 |
47.4 |
43.3 |
39.7 |
18 |
49.1 |
48.9 |
48.7 |
47.8 |
47.0 |
46.4 |
45.5 |
44.9 |
44.1 |
42.1 |
38.5 |
20 |
42.2 |
42.1 |
41.9 |
41.7 |
41.5 |
41.0 |
40.2 |
39.8 |
39.0 |
38.5 |
37.4 |
22 |
36.8 |
36.7 |
36.5 |
36.3 |
36.1 |
36.0 |
35.8 |
35.4 |
34.8 |
34.3 |
33.7 |
24 |
32.5 |
32.3 |
32.1 |
31.9 |
31.7 |
31.7 |
31.4 |
31.4 |
31.2 |
30.8 |
30.2 |
26 |
28.9 |
28.7 |
28.5 |
28.3 |
28.1 |
28.0 |
27.8 |
27.8 |
27.5 |
27.4 |
27.2 |
28 |
25.9 |
25.7 |
25.5 |
25.3 |
25.1 |
25.0 |
24.7 |
24.7 |
24.5 |
24.4 |
24.1 |
30 |
23.3 |
23.1 |
22.9 |
22.7 |
22.5 |
22.4 |
22.2 |
22.1 |
21.9 |
21.8 |
21.5 |
32 |
21.1 |
20.9 |
20.7 |
20.5 |
20.3 |
20.2 |
19.9 |
19.9 |
19.7 |
19.6 |
19.3 |
34 |
19.1 |
19.0 |
18.8 |
18.6 |
18.4 |
18.3 |
18.0 |
18.0 |
17.7 |
17.6 |
17.4 |
36 |
17.4 |
17.3 |
17.1 |
16.9 |
16.7 |
16.6 |
16.3 |
16.3 |
16.0 |
15.9 |
15.7 |
38 |
15.9 |
15.8 |
15.6 |
15.4 |
15.1 |
15.0 |
14.8 |
14.8 |
14.5 |
14.4 |
14.2 |
40 |
14.6 |
14.4 |
14.2 |
14.0 |
13.8 |
13.7 |
13.4 |
13.4 |
13.2 |
13.0 |
12.8 |
42 |
13.4 |
13.2 |
13.0 |
12.8 |
12.6 |
12.5 |
12.2 |
12.2 |
12.0 |
11.8 |
11.6 |
44 |
12.3 |
12.1 |
11.9 |
11.7 |
11.5 |
11.4 |
11.1 |
11.1 |
10.9 |
10.7 |
10.5 |
46 |
11.2 |
11.1 |
10.9 |
10.7 |
10.5 |
10.4 |
10.1 |
10.1 |
9.9 |
9.8 |
9.5 |
48 |
|
10.2 |
10.0 |
9.8 |
9.6 |
9.5 |
9.2 |
9.2 |
9.0 |
8.8 |
8.6 |
50 |
|
9.3 |
9.2 |
9.0 |
8.8 |
8.7 |
8.4 |
8.4 |
8.1 |
8.0 |
7.8 |
52 |
|
|
8.4 |
8.2 |
8.0 |
7.9 |
7.6 |
7.6 |
7.4 |
7.3 |
7.0 |
54 |
|
|
|
7.5 |
7.3 |
7.2 |
6.9 |
6.9 |
6.7 |
6.6 |
6.3 |
56 |
|
|
|
|
6.6 |
6.5 |
6.3 |
6.3 |
6.0 |
5.9 |
5.7 |
58 |
|
|
|
|
6.0 |
5.9 |
5.7 |
5.7 |
5.4 |
5.3 |
5.1 |
60 |
|
|
|
|
|
5.3 |
5.1 |
5.1 |
4.9 |
4.7 |
4.5 |
62 |
|
|
|
|
|
|
4.6 |
4.6 |
4.3 |
4.2 |
4.0 |
64 |
|
|
|
|
|
|
|
4.1 |
3.8 |
3.7 |
3.5 |
66 |
|
|
|
|
|
|
|
3.6 |
3.4 |
3.3 |
3.0 |
68 |
|
|
|
|
|
|
|
|
2.9 |
2.8 |
2.6 |
70 |
|
|
|
|
|
|
|
|
|
2.4 |
2.2 |
Magnification |
7 |
6 |
6 |
6 |
5 |
5 |
5 |
4 |
4 |
4 |
4 |
Notes:
1.When the main boom length exceeds 71m, the waist rope must be used for the combination at the "*" position. When the main boom length exceeds 74m, it is recommended to use an inclined wedge to assist in raising the boom.
2.The tower arm rear pull plate must be removed from each boom section, and the tower arm guide pulley must be removed from the top section of the main boom.