XLC260 Construction Crawler Tower Crane 260T Giant Crawler Cranes 60 km/h
Product Details:
Place of Origin: | China |
Brand Name: | XCMG |
Model Number: | XLC260 |
Payment & Shipping Terms:
Minimum Order Quantity: | One Crane |
---|---|
Price: | Negotiable Price |
Packaging Details: | Packing According to Customer Requirements |
Delivery Time: | According to Order Confirmation |
Payment Terms: | L/C,T/T |
Supply Ability: | Supply According to Customer Needs |
Detail Information |
|||
Maximum Lifting Capacity: | 260 Tons | Fuel Type: | Diesel |
---|---|---|---|
Safety Features: | Load Moment Limiter, Anti-two Block System | Type: | Hydraulic |
Cabin: | Fully Enclosed With Air Conditioning | Travel Speed: | 60 Km/h |
Maximum Lifting Height: | 80 Meters | Maximum Working Radius: | 40 Meters |
Counterweight: | Removable | Boom Length: | 50 Meters |
Highlight: | construction crawler tower crane,crawler tower crane 260t,giant crawler cranes 60 km/h |
Product Description
Improve Construction Efficiency: The 260T Crawler Crane Is Fully Functional And Speeds Up Construction
XLC260 Crawler Crane Technical Specifications
Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m
Main boom working condition_main boom main hook characteristics without arm end pulley (HB/1)
Main boom working condition_No arm end pulley HB/1_65t+30t main boom main hook performance
Operating radius(m) |
Main boom length(m) |
||||||||||
|
23 |
26 |
29 |
32 |
35 |
38 |
41 |
44 |
47 |
50 |
53 |
5.5 |
231.8 |
|
|
|
|
|
|
|
|
|
|
6 |
207.9 |
207.9 |
207.8 |
|
|
|
|
|
|
|
|
7 |
172 |
172 |
171.8 |
171.9 |
171.7 |
165.7 |
|
|
|
|
|
8 |
146.4 |
146.4 |
146.2 |
146.2 |
146 |
142.3 |
138 |
133.9 |
|
|
|
9 |
127.2 |
127.2 |
127 |
127 |
126.8 |
124.4 |
121 |
117.8 |
114.7 |
111.7 |
108.9 |
10 |
112.2 |
112.2 |
112.1 |
112.1 |
111.9 |
110.4 |
107.6 |
105 |
102.4 |
99.9 |
97.6 |
11 |
100.3 |
100.3 |
100.1 |
100.2 |
100 |
99.1 |
96.7 |
94.5 |
92.4 |
90.3 |
88.2 |
12 |
90.8 |
90.8 |
90.6 |
90.6 |
90.4 |
89.7 |
87.7 |
85.9 |
84 |
82.2 |
80.4 |
13 |
82.8 |
82.9 |
82.8 |
82.8 |
82.6 |
81.9 |
80.1 |
78.5 |
76.9 |
75.3 |
73.8 |
14 |
74.3 |
74.4 |
74.4 |
74.4 |
74.4 |
74.3 |
73.7 |
72.3 |
70.8 |
69.4 |
68 |
15 |
67.2 |
67.4 |
67.3 |
67.4 |
67.3 |
67.2 |
67.1 |
66.9 |
65.5 |
64.3 |
63 |
16 |
61.3 |
61.4 |
61.4 |
61.5 |
61.4 |
61.3 |
61.2 |
61.1 |
60.9 |
59.8 |
58.6 |
17 |
56.3 |
56.4 |
56.3 |
56.4 |
56.3 |
56.2 |
56.1 |
56 |
55.8 |
55.7 |
54.8 |
18 |
51.9 |
52 |
52 |
52.1 |
51.9 |
51.9 |
51.7 |
51.6 |
51.5 |
51.3 |
51.1 |
19 |
48.1 |
48.2 |
48.2 |
48.3 |
48.1 |
48 |
47.9 |
47.8 |
47.6 |
47.5 |
47.3 |
20 |
44.7 |
44.9 |
44.8 |
44.9 |
44.8 |
44.7 |
44.5 |
44.4 |
44.3 |
44.1 |
43.9 |
22 |
|
39.2 |
39.2 |
39.3 |
39.2 |
39.1 |
38.9 |
38.8 |
38.6 |
38.5 |
38.2 |
24 |
|
34.6 |
34.6 |
34.8 |
34.6 |
34.5 |
34.3 |
34.3 |
34.1 |
33.9 |
33.7 |
26 |
|
|
30.8 |
31 |
30.9 |
30.8 |
30.6 |
30.5 |
30.3 |
30.1 |
29.9 |
28 |
|
|
|
27.8 |
27.7 |
27.6 |
27.4 |
27.4 |
27.2 |
27 |
26.8 |
30 |
|
|
|
|
25 |
25 |
24.8 |
24.7 |
24.5 |
24.3 |
24.1 |
32 |
|
|
|
|
22.7 |
22.6 |
22.5 |
22.4 |
22.2 |
22 |
21.8 |
34 |
|
|
|
|
|
20.6 |
20.4 |
20.4 |
20.2 |
20 |
19.8 |
36 |
|
|
|
|
|
|
18.7 |
18.6 |
18.4 |
18.3 |
18 |
38 |
|
|
|
|
|
|
|
17.1 |
16.9 |
16.7 |
16.5 |
40 |
|
|
|
|
|
|
|
15.7 |
15.5 |
15.3 |
15.1 |
42 |
|
|
|
|
|
|
|
|
14.2 |
14 |
13.8 |
44 |
|
|
|
|
|
|
|
|
|
12.9 |
12.7 |
46 |
|
|
|
|
|
|
|
|
|
|
11.6 |
Magnification |
24 |
22 |
20 |
18 |
16 |
15 |
14 |
13 |
12 |
11 |
10 |
Notes:
1. The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
2. The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
3. The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
4. The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
5. The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.
Main boom working condition_No arm end pulley HB/1_65t+30t main boom main hook performance
Operating radius(m) |
Main boom length(m) |
|||||||||
|
56 |
59 |
62 |
65 |
68 |
71 |
74 |
77* |
80* |
83* |
10 |
95.6 |
93.4 |
91.2 |
|
|
|
|
|
|
|
11 |
86.6 |
84.7 |
82.9 |
81.1 |
78.8 |
71 |
|
|
|
|
12 |
79.1 |
77.4 |
75.8 |
74.2 |
72.6 |
69.8 |
62.8 |
61.2 |
56 |
|
13 |
72.6 |
71.2 |
69.7 |
68.3 |
66.9 |
65.7 |
61.8 |
60.4 |
55.3 |
50.8 |
14 |
67.1 |
65.7 |
64.4 |
63.2 |
61.9 |
60.8 |
59.6 |
58.6 |
54.6 |
50.1 |
15 |
62.2 |
61 |
59.8 |
58.7 |
57.5 |
56.5 |
55.4 |
54.5 |
53.5 |
49.4 |
16 |
57.9 |
56.8 |
55.8 |
54.7 |
53.6 |
52.7 |
51.7 |
50.9 |
49.9 |
48.8 |
17 |
54.1 |
53.1 |
52.2 |
51.2 |
50.2 |
49.4 |
48.4 |
47.7 |
46.7 |
45.9 |
18 |
50.8 |
49.8 |
48.9 |
48 |
47.1 |
46.3 |
45.4 |
44.8 |
43.9 |
43.1 |
19 |
47.4 |
46.8 |
46 |
45.1 |
44.3 |
43.6 |
42.7 |
42.1 |
41.3 |
40.6 |
20 |
44.1 |
43.9 |
43.4 |
42.5 |
41.7 |
41.1 |
40.3 |
39.7 |
38.9 |
38.3 |
22 |
38.4 |
38.2 |
38 |
37.8 |
37.3 |
36.7 |
36 |
35.5 |
34.8 |
34.2 |
24 |
33.8 |
33.6 |
33.4 |
33.2 |
33 |
32.9 |
32.4 |
31.9 |
31.3 |
30.7 |
26 |
30.1 |
29.9 |
29.7 |
29.4 |
29.2 |
29.1 |
28.8 |
28.8 |
28.3 |
27.8 |
28 |
27 |
26.7 |
26.5 |
26.3 |
26 |
25.9 |
25.7 |
25.6 |
25.4 |
25.2 |
30 |
24.3 |
24 |
23.8 |
23.6 |
23.3 |
23.2 |
23 |
22.9 |
22.7 |
22.5 |
32 |
22 |
21.7 |
21.5 |
21.3 |
21 |
20.9 |
20.6 |
20.6 |
20.3 |
20.2 |
34 |
20 |
19.7 |
19.5 |
19.3 |
19 |
18.9 |
18.6 |
18.6 |
18.3 |
18.1 |
36 |
18.2 |
18 |
17.8 |
17.5 |
17.2 |
17.1 |
16.9 |
16.9 |
16.5 |
16.4 |
38 |
16.6 |
16.4 |
16.2 |
15.9 |
15.7 |
15.5 |
15.3 |
15.2 |
15 |
14.8 |
40 |
15.3 |
15 |
14.8 |
14.5 |
14.3 |
14.1 |
13.9 |
13.8 |
13.6 |
13.4 |
42 |
14 |
13.8 |
13.6 |
13.3 |
13 |
12.9 |
12.6 |
12.6 |
12.3 |
12.2 |
44 |
12.9 |
12.6 |
12.4 |
12.2 |
11.9 |
11.8 |
11.5 |
11.5 |
11.2 |
11 |
46 |
11.8 |
11.6 |
11.4 |
11.1 |
10.9 |
10.7 |
10.5 |
10.4 |
10.2 |
10 |
48 |
10.9 |
10.7 |
10.5 |
10.2 |
9.9 |
9.8 |
9.5 |
9.5 |
9.2 |
9.1 |
50 |
10 |
9.8 |
9.6 |
9.3 |
9.1 |
8.9 |
8.7 |
8.6 |
8.4 |
8.2 |
52 |
|
9 |
8.8 |
8.5 |
8.3 |
8.2 |
7.9 |
7.9 |
7.6 |
7.4 |
54 |
|
|
8.1 |
7.8 |
7.6 |
7.4 |
7.2 |
7.1 |
6.9 |
6.7 |
56 |
|
|
|
7.1 |
6.9 |
6.8 |
6.5 |
6.5 |
6.2 |
6 |
58 |
|
|
|
6.5 |
6.3 |
6.1 |
5.9 |
5.8 |
5.6 |
5.4 |
60 |
|
|
|
|
5.7 |
5.5 |
5.3 |
5.3 |
5 |
4.8 |
62 |
|
|
|
|
|
5 |
4.7 |
4.7 |
4.4 |
4.3 |
64 |
|
|
|
|
|
|
4.2 |
4.2 |
3.9 |
3.8 |
66 |
|
|
|
|
|
|
3.7 |
3.7 |
3.5 |
3.3 |
68 |
|
|
|
|
|
|
|
3.3 |
3 |
2.8 |
70 |
|
|
|
|
|
|
|
|
2.6 |
2.4 |
72 |
|
|
|
|
|
|
|
|
|
2 |
Magnification |
9 |
9 |
8 |
7 |
7 |
6 |
5 |
5 |
5 |
4 |
Notes:
1. The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
2. The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
3. The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
4. The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
5. The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.