Second Hand 260T Mobile Cranes Hydraulic 80Km/H Travel Speed For High Rise Building

Second Hand 260T Mobile Cranes Hydraulic 80Km/H Travel Speed For High Rise Building

Product Details:

Place of Origin: China
Brand Name: XCMG
Model Number: XLC260

Payment & Shipping Terms:

Minimum Order Quantity: One Crane
Price: Negotiable Price
Packaging Details: Packing According to Customer Requirements
Delivery Time: According to Order Confirmation
Payment Terms: L/C,T/T
Supply Ability: Supply According to Customer Needs
Get Best Price Contact Now

Detail Information

Control System: Load Moment Indicator (LMI) Boom Length: 33.5 Meters
Safety Features: Anti-two Block System, Overload Protection, Emergency Stop Button Jib Length: 12.8 Meters
Maximum Tip Height: 46.3 Meters Outrigger Type: Hydraulic
Maximum Lifting Capacity: 260 Tons Maximum Travel Speed: 80 Km/h
Highlight:

260t mobile cranes

,

mobile cranes hydraulic

,

260t mobile crawler crane

Product Description

Second-hand 260T Crawler Crane Can Be Used For High-rise Building Construction To Ensure Construction Quality

XLC260 Crawler Crane Technical Specifications

 

Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m

 

Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)

 

Main boom working condition_with main boom main hook HBS/2_75t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

23

26

29

32

35

38

41

44

47

50

53

7

13.5

13.5

 

 

 

 

 

 

 

 

 

8

13.5

13.5

13.5

13.5

13.5

 

 

 

 

 

 

9

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

 

 

10

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

11

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

12

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

38

 

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

40

 

 

 

 

 

 

 

12.7

13.5

13.5

13.5

42

 

 

 

 

 

 

 

 

13.5

13.5

13.5

44

 

 

 

 

 

 

 

 

12.6

12.4

12.2

46

 

 

 

 

 

 

 

 

 

11.3

11.1

48

 

 

 

 

 

 

 

 

 

 

10

Magnification

1

1

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

 

Main boom working condition_with main boom main hook HBS/2_75t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

56

59

62

65

68

71

74

77*

80*

83*

11

13.5

13.5

 

 

 

 

 

 

 

 

12

13.5

13.5

13.5

13.5

13.5

 

 

 

 

 

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

 

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

38

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

40

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.2

42

13.5

13.5

13.2

13

12.7

12.6

12.3

12.3

12

11.9

44

12.4

12.2

12

11.7

11.5

11.3

11.1

11

10.8

10.6

46

11.3

11

10.8

10.6

10.3

10.2

9.9

9.9

9.6

9.5

48

10.2

10

9.8

9.5

9.3

9.2

8.9

8.9

8.6

8.4

50

9.3

9

8.8

8.6

8.3

8.2

8

7.9

7.7

7.5

52

8.4

8.2

8

7.7

7.5

7.3

7.1

7

6.8

6.6

54

 

7.3

7.2

6.9

6.7

6.5

6.3

6.2

6

5.8

56

 

 

6.4

6.2

5.9

5.8

5.5

5.5

5.2

5.1

58

 

 

 

5.5

5.2

5.1

4.8

4.8

4.5

4.4

60

 

 

 

 

4.6

4.4

4.2

4.2

3.9

3.7

62

 

 

 

 

3.9

3.8

3.6

3.6

3.3

3.1

64

 

 

 

 

 

3.3

3

3

2.7

2.6

66

 

 

 

 

 

 

2.5

2.5

2.2

2

68

 

 

 

 

 

 

 

2

 

 

Magnification

1

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

Want to Know more details about this product
I am interested in Second Hand 260T Mobile Cranes Hydraulic 80Km/H Travel Speed For High Rise Building could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.