Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System
Product Details:
Place of Origin: | China |
Brand Name: | XCMG |
Model Number: | XLC260 |
Payment & Shipping Terms:
Minimum Order Quantity: | One Crane |
---|---|
Price: | Negotiable Price |
Packaging Details: | Packing According to Customer Requirements |
Delivery Time: | According to Order Confirmation |
Payment Terms: | L/C,T/T |
Supply Ability: | Supply According to Customer Needs |
Detail Information |
|||
Maximum Wind Speed For Operation: | Up To 20 M/s | Control System: | Hydraulic |
---|---|---|---|
Maximum Lifting Height: | Up To 120 Meters | Engine Power: | Up To 500 KW |
Outrigger Length: | Up To 10 Meters | Maximum Working Radius: | Up To 80 Meters |
Travel Speed: | Up To 80 Km/h | Boom Length: | Up To 100 Meters |
Counterweight: | Up To 100 Tons | Maximum Gradeability: | Up To 30% |
Highlight: | construction crawler crane 260t,construction crawler telescopic crane,260t crawler telescopic crane |
Product Description
260T Crawler Crane Plays A Key Role In Power Engineering Installation
XLC260 Crawler Crane Technical Specifications
Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m
Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)
Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance
Operating radius(m) |
Main boom length(m) |
||||||||||
|
23 |
26 |
29 |
32 |
35 |
38 |
41 |
44 |
47 |
50 |
53 |
7 |
13.5 |
13.5 |
|
|
|
|
|
|
|
|
|
8 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
|
|
|
|
|
|
9 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
|
|
|
|
10 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
11 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
12 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
14 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
15 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
16 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
17 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
18 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
19 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
20 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
22 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
24 |
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
26 |
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
28 |
|
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
30 |
|
|
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
32 |
|
|
|
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
34 |
|
|
|
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
36 |
|
|
|
|
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
38 |
|
|
|
|
|
|
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
40 |
|
|
|
|
|
|
|
13.5 |
13.2 |
13.1 |
12.9 |
42 |
|
|
|
|
|
|
|
|
12 |
11.8 |
11.6 |
44 |
|
|
|
|
|
|
|
|
10.8 |
10.6 |
10.4 |
46 |
|
|
|
|
|
|
|
|
8 |
9.6 |
9.4 |
48 |
|
|
|
|
|
|
|
|
|
|
8.4 |
Magnification |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.
Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance
Operating radius(m) |
Main boom length(m) |
||||||||
|
56 |
59 |
62 |
65 |
68 |
71 |
74 |
77* |
80* |
11 |
13.5 |
13.5 |
|
|
|
|
|
|
|
12 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
|
|
|
|
13 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
|
|
14 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
15 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
16 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
17 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
18 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
19 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
20 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
22 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
24 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
26 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
28 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
30 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
32 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
34 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
36 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
38 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.5 |
13.2 |
13.1 |
12.9 |
40 |
13 |
12.8 |
12.6 |
12.4 |
12.1 |
12 |
11.7 |
11.7 |
11.4 |
42 |
11.8 |
11.5 |
11.3 |
11.1 |
10.8 |
10.7 |
10.4 |
10.4 |
10.1 |
44 |
10.6 |
10.4 |
10.2 |
9.9 |
9.7 |
9.5 |
9.3 |
9.2 |
9 |
46 |
9.6 |
9.3 |
9.1 |
8.9 |
8.6 |
8.5 |
8.2 |
8.2 |
7.9 |
48 |
8.6 |
8.4 |
8.2 |
7.9 |
7.7 |
7.5 |
7.3 |
7.2 |
7 |
50 |
7.7 |
7.5 |
7.3 |
7 |
6.8 |
6.7 |
6.4 |
6.4 |
6.1 |
52 |
6.9 |
6.7 |
6.5 |
6.2 |
6 |
5.8 |
5.6 |
5.5 |
5.3 |
54 |
|
5.9 |
5.7 |
5.5 |
5.2 |
5.1 |
4.8 |
4.8 |
4.5 |
56 |
|
|
5 |
4.8 |
4.5 |
4.4 |
4.2 |
4.1 |
3.9 |
58 |
|
|
|
4.1 |
3.9 |
3.8 |
3.5 |
3.5 |
3.2 |
60 |
|
|
|
3.5 |
3.3 |
3.2 |
2.9 |
2.9 |
2.6 |
62 |
|
|
|
|
2.7 |
2.6 |
2.3 |
2.3 |
2.1 |
64 |
|
|
|
|
|
2.1 |
1.8 |
1.8 |
|
Magnification |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1 |
1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.
2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.
3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.
4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.
5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.