Power Engineering Installation Construction Crawler Crane 260T  Hydraulic Control System

Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System

Product Details:

Place of Origin: China
Brand Name: XCMG
Model Number: XLC260

Payment & Shipping Terms:

Minimum Order Quantity: One Crane
Price: Negotiable Price
Packaging Details: Packing According to Customer Requirements
Delivery Time: According to Order Confirmation
Payment Terms: L/C,T/T
Supply Ability: Supply According to Customer Needs
Get Best Price Contact Now

Detail Information

Maximum Wind Speed For Operation: Up To 20 M/s Control System: Hydraulic
Maximum Lifting Height: Up To 120 Meters Engine Power: Up To 500 KW
Outrigger Length: Up To 10 Meters Maximum Working Radius: Up To 80 Meters
Travel Speed: Up To 80 Km/h Boom Length: Up To 100 Meters
Counterweight: Up To 100 Tons Maximum Gradeability: Up To 30%
Highlight:

construction crawler crane 260t

,

construction crawler telescopic crane

,

260t crawler telescopic crane

Product Description

260T Crawler Crane Plays A Key Role In Power Engineering Installation

XLC260 Crawler Crane Technical Specifications

 

Crawler crane models: XLC260
Max rated lifting capacity: 260t
Max lifting moment: 1430t.m

 

Main boom working condition_Characteristics of boom end pulley auxiliary hook with main boom main hook (HBS/2)

 

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

23

26

29

32

35

38

41

44

47

50

53

7

13.5

13.5

 

 

 

 

 

 

 

 

 

8

13.5

13.5

13.5

13.5

13.5

 

 

 

 

 

 

9

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

 

 

10

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

11

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

12

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

13.5

38

 

 

 

 

 

 

13.5

13.5

13.5

13.5

13.5

40

 

 

 

 

 

 

 

13.5

13.2

13.1

12.9

42

 

 

 

 

 

 

 

 

12

11.8

11.6

44

 

 

 

 

 

 

 

 

10.8

10.6

10.4

46

 

 

 

 

 

 

 

 

8

9.6

9.4

48

 

 

 

 

 

 

 

 

 

 

8.4

Magnification

1

1

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

 

Main boom working condition_with main boom main hook HBS/2_65t+30t arm end pulley auxiliary hook performance

Operating radius(m)

Main boom length(m)

 

56

59

62

65

68

71

74

77*

80*

11

13.5

13.5

 

 

 

 

 

 

 

12

13.5

13.5

13.5

13.5

13.5

 

 

 

 

13

13.5

13.5

13.5

13.5

13.5

13.5

13.5

 

 

14

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

15

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

16

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

17

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

18

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

19

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

20

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

22

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

24

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

26

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

28

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

30

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

32

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

34

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

36

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

13.5

38

13.5

13.5

13.5

13.5

13.5

13.5

13.2

13.1

12.9

40

13

12.8

12.6

12.4

12.1

12

11.7

11.7

11.4

42

11.8

11.5

11.3

11.1

10.8

10.7

10.4

10.4

10.1

44

10.6

10.4

10.2

9.9

9.7

9.5

9.3

9.2

9

46

9.6

9.3

9.1

8.9

8.6

8.5

8.2

8.2

7.9

48

8.6

8.4

8.2

7.9

7.7

7.5

7.3

7.2

7

50

7.7

7.5

7.3

7

6.8

6.7

6.4

6.4

6.1

52

6.9

6.7

6.5

6.2

6

5.8

5.6

5.5

5.3

54

 

5.9

5.7

5.5

5.2

5.1

4.8

4.8

4.5

56

 

 

5

4.8

4.5

4.4

4.2

4.1

3.9

58

 

 

 

4.1

3.9

3.8

3.5

3.5

3.2

60

 

 

 

3.5

3.3

3.2

2.9

2.9

2.6

62

 

 

 

 

2.7

2.6

2.3

2.3

2.1

64

 

 

 

 

 

2.1

1.8

1.8

 

Magnification

1

1

1

1

1

1

1

1

1

 

1.The actual lifting capacity must be deducted from the rated lifting capacity in this table by the weight of the hook, sling and wire rope wrapped around the hook and boom head.

2.The rated load in the table is the value when the load is lifted slowly and steadily on a horizontal hard ground and the non-travel lifting work is performed.

3.The rated load in the table is based on the calculation value of the main boom section without the tower arm back plate, tower arm guide pulley and arm end single pulley.

4.The tower arm back plate needs to be removed from each boom section, and the tower arm guide pulley needs to be removed from the top section of the main boom.

5.The waist rope needs to be used for the combination at the "*" when the main boom length exceeds 74m, and it is recommended to use a wedge to assist the boom when the main boom length exceeds 77m.

Want to Know more details about this product
I am interested in Power Engineering Installation Construction Crawler Crane 260T Hydraulic Control System could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.