XGC 300t Crawler Crane Xcmg For Large Projects

XGC 300t Crawler Crane Xcmg For Large Projects

Product Details:

Place of Origin: China
Brand Name: XCMG
Model Number: XGC 300t

Payment & Shipping Terms:

Minimum Order Quantity: One Crane
Price: Negotiable Price
Packaging Details: Packing According to Customer Requirements
Delivery Time: According to Order Confirmation
Payment Terms: L/C,T/T
Supply Ability: Supply According to Customer Needs
Get Best Price Chat Now

Detail Information

Max. Lifting Height: 120m Maximum Lifting Capacity: 300 Tons
Maximum Radius: 80 M Max. Gradeability: 30%
Crawler Length: 10.5 M Model: XGC300
Boom Length: 18-96m Maximum Tip Height: 152 M
Counterweight: 100 Tons Max. Line Speed: 120m/min
Fuel Tank Capacity: 1,500 Liters Max. Slewing Speed: 1.5rpm
Highlight:

300t crawler crane xcmg

,

large projects crawler crane xcmg

Product Description

 

Crawler Crane 1.5m-4.5m Arm Connection Sections And Main Boom Assembly For 300t Max Rated Lifting Capacity.

XGC 300t(-I)Crawler Crane Technical Specifications


Crawler crane models: XGC 300t(-I)
Max rated lifting capacity: 300t
Maximum lifting moment: 1865t.m

 

Shield working conditions

 

A. Shield working conditions_main boom section combination table
 

Name and quantity  Main boom assembly

Main boom bottom section 10.5m

Main boom middle section 3m

Main boom middle section 6m

Main boom middle section 12mA

Main boom tapered section 7m

Main arm connection section 1.5

Boom pulley block

HB19

1

0

0

0

1

1

1

HB22

1

1

0

0

1

1

1

HB25

1

2[0]

0[1]

0

1

1

1

HB28

1

3[1]

0[1]

0

1

1

1

HB31

1

2[0]

1[0]

0[1]

1

1

1

 

Notes:

1.The rear pull plates of the tower arm need to be removed from each boom section, and the guide pulleys for the tower arm need to be removed from the main boom reducer section.

2.Two main boom intermediate sections 3m can be used to replace one main boom intermediate section 6m, or two main boom intermediate sections 3m and one main boom intermediate section 6m can be used to replace one main boom intermediate section 12mA. When replacing, attention must be paid to the matching of the number of pull plates and pins.

 

B. Shield working conditions_Shield auxiliary arm section combination table

 

Name and quantity 
Shield arm assembly

Shield arm bottom section4.5m

Shield arm middle section 3m

Shield arm middle section 6m

Shield arm top section 2.5m

Shield arm single pulley

F(S) 7

1

0

0

1

(1)

F(S)10

1

1

0

1

(1)

 

Notes:

1. (S) ---- indicates the optional single pulley of the shield jib [single pulley of the shield arm and single pulley of the fixed jib].

2. The shield jib section is common to the fixed jib section.

3. To ensure the maximum function of the arm combination, it is recommended that users choose to purchase the shield jib length of 7m.
 

C. Shield working condition arm table
 

Turntable counterweight 115t + vehicle body counterweight 40t

Main boom length

Shield arm length

HB19

HB22

HB25

HB28

HB31

F(S) 7

F(S)10

 

Notes:

1. “●” - The boom can be raised.

2. The rear pull plates of the tower arm need to be removed from each boom section, and the guide pulleys for installing the tower arm need to be removed from the main boom reducer.

3. A 260t hook is recommended for the main boom and a 160t hook is recommended for the shield auxiliary boom.

4. When raising the boom, please place the crawler drive wheel behind the vehicle body.

Want to Know more details about this product
I am interested in XGC 300t Crawler Crane Xcmg For Large Projects could you send me more details such as type, size, quantity, material, etc.
Thanks!
Waiting for your reply.